ATGS realizes automatics systems on the base of following program-technical complexes: telemechanics system STN-3000 and dispatcher control system SPURT.
Telemechanics system STN-3000 includes complete kit of program-technical means for automation of territorially distributed technological entities. Development and production of the system is executed in Russia. Main distinctive features of STN-3000 are: embedded communication means, complete supply with sensors and primary devices, availability of natural gas and fluids commercial flow rate computers, capability of Software adjust from the high level control, operation of the system in severe climatic conditions (from -50oC to +70 oC). The system and its components have international and Russian certificates of metrology and explosion protection. STN-3000 is used for creation of automation systems of various functions, primarily systems of linear telemechanics for gas, petroleum and products pipelines control; telemechanization of gas wells groups, including nonelectrified ones; and automation of other territorially distributed entities operating outdoors.
Program-technical complex SPURT was developed for automation of dispatcher control at the enterprises for production and transportation of natural gas, oil and oil products and other entities of fuel-energy complex. SPURT allows to solve tasks of SCADA system during its integration with different systems of “site” level; tasks of storage and handling for archive and dispatcher report information; computational tasks and tasks of informational support for specialists and tasks of Intranet means control (with observation of all information safety measures).
SPURT can operate under control of such operating systems as UNIX (Sun, HP-UX), LINUX and Windows. On the base of SPURT, dispatcher control complexes with different complexities and structures, including territorially distributed multilevel systems, are created. On the basis of SPURT, Subsystem of Support for decision making, including GTS model and expert system (the N.K. Baybakov Award) and training complex for training of dispatcher personnel of different qualifications (CDP, DP of LPA; OAO Gazprom diploma for the best simulator) were developed.
The STN-3000 telemechanics complex and the SPURT program-technical complex have passed interdepartmental tests and are recommended for application in “Gazprom” Private Corp.
On the base of presented complexes ATGS creates the following types of systems:
- Systems of linear telemechanics for pipelines, including ones containing systems of leakage detection integration.
- Systems of automated and automatic control for gas distributing points (GDP) and stations (GDS), and pump stations (PS), including gas flow rate computers.
- Telemechanics systems for gas wells of fields and stations of gas underground stations.
- Dispatcher stations of linear production subdivisions, central dispatcher stations of enterprises, multilevel integrated information-control systems.
- Program complexes for automation of dispatcher control, including metering and planning of energy resources supply and others.
- Control integrated systems for stations of gas underground storage (IUS SHPG). The solution includes automation of all main and auxiliary entities of SHPG: collecting gas distributing stations, workshops for gas purification, methanol and diethyleneglycol regeneration, compressor station, cleaning facilities, energetic and others. It was realized algorithms of processescontrol and optimization, united dispatcher point with tasks of SCADA and MES levels.
Today more than 60 Dispatcher control complexes and more than 50 Telemechanics systems, including more than 800 CP and 80 SAC of GDS operate on the territory of the Russian Federation. Many years’ experience of exploitation has proved their high reliability
Most significant realized projects are:
- Multilevel dispatcher systems with telemechanics systems, implemented in “Gazprom transgaz Tchajkovsky”, “Gazprom transgaz Tomsk”, “Gazprom transgaz Kazan”, “Gazprom transgaz Volgograd”;
- Telemechanics systems of gas pipelines: “Jamal-Evropa”, “Zapoljarnoe-Urengoj”, “Severo-Evropejsky gas pipeline”, “Pochinki-Grezovets”, “Urengoj-Uzhgorod”;
- Telemechanics systems of wells and fields “Gazprom dobycha Urengoj”, and fields: “Zapoljarnoe”, “Beregovoe”, “Uzhnorusskoe”;
- ASC of technological processes of oil pipeline for “Peterburgtransnefteprodukt”, including CP of telemechanics, SAC of pump stations, main and two additional DP.
Projects of gas pipelines “Bovanenkovo-Ukhta”, “Sakhalin-Khabarovsk-Vladivostok” and “Kamchatka” are in process
Introduced systems based on SPURT and STN-3000 program-technical complexes
Gas transportation enterprises (“GAZPROM” Public Corporation)
|
«Gazprom transgas Chaikovskiy»
-
Training complex for dispatching personnel training of different levels ( diploma for the best trainer-simulator of "Gazprom" in 2009.)
-
«Operative-dispatcher management for gas transportation enterprise» program complex
-
«Dispatcher control system» («Gas delivery») program complex
-
«Parameters archive of gas transportation system» program complex
-
Dispatcher Station of LPA integrated with ACS of CS PROCONTROL - P (ABB), LTS STN-3000
-
Linear Part: 5 CPs of LP, CP of GRA, 1 ACS of GDS
-
Dispatcher Station of LPA integrated with ACS of CS based on GE-Fanuc controllers (General Electric) , LTS STN-3000
-
Linear Part: 6 CPs of LP, 4 CPs of GDS, 6 ACS of GDS
-
Dispatcher Station of LPA, integrated with ACS of CW based on «PEP-Modular» controllers, LTS STN-3000
-
Linear Part: 7 CPs of LP, ACS of GMS
5. Chaikovskoye LPA
-
Dispatcher Station of LPA, redundant, integrated with ACS CW based on MSMC, ACS CW of CCC, LTS STN-3000
-
Linear Part: 9 CPs of LP, 5 ACSs of GDS
-
"Passport of technical supply lines" program complex
6. Bardymskoye LPA (description)
-
Dispatcher Station of LPA, redundant, integrated with ACS CW of “RIUS”, ACS CW based on MSMC, ACS CW of CCC, LTS STN-3000
-
Linear Part: 5 CPs of LP, 2 ACS of GDS
7. Bereznyakovskoye LPA
-
Dispatcher Station of LPA
-
Linear Part: 3 ACS of GDS
8. Gornozavodskoye LPA
-
Dispatcher Station of LPA redundant, integrated with LTS STN-3000
-
Linear Part: 19 CPs of LP, 2 ACSs of GDS
9. Mozschginskoye LPA
-
Dispatcher Station of LPA, integrated with ACS KT of CCC, LTS STN-3000, CP of guard cocks “Kentavr”
-
Linear Part: 5CPs of LP, 3 ACSs of GDS, NP of GRA
10. Kungurskoye LPA
-
Dispatcher Station of LPA, integrated with ACS KT of MSKU 4510, SpeedTronic, A705, LTS STN-3000
-
Linear Part: 18 CPs of LP, 21 CP
11. Permskoye LPA
-
Dispatcher Station of LPA, integrated with DS of Dobryanskaya CS, ACS of GDS STN-3000
-
Linear Part: 1 ACS of GDS
12. Permskoye LPA: SCADA system of «Dobryanka» Compressor Station (CS)
-
Dispatcher Station of CS, integrated with ACS of CW PROCONTROL-P, LTS STN-3000
-
Linear Part: 4 CPs of LP
13. Permskoye LPA, CS Okhanskaya
-
Dispatcher Station of CS, integrated with data collection system «Spider», GDS Ohanskaya
14. Votkinskoye LPA, Izhsevskaya industrial site
-
Dispatcher Station of LPA, integrated with ACS of CS Igrinskaya, LTS STN-3000
-
Linear Part: 4 CPs of LP, 2 CP of GDS
15. Votkinskoye LPA, CS Igrinskaya
-
Dispatcher Station of CS, integrated with ACS of CS Igrinskaya, LTS STN-3000
-
Linear Part: 4 CPs of LP, 3 CP of GDS, 4 ACS of GDS
16. Uvinskoye LPA
-
Dispatcher Station of LPA, redundant, LTS STN-3000
-
Linear Part: 9 CPs of LP
«Gazprom transgas Sankt-Peterburg»
17. MES and SCADA system of Enterprise: Communication system CDP, integrated with DS of SPURT
18. Volkhovskoye LPA
-
Dispatcher Station of LPA, integrated with ACS CW based on MSMC,LTS STN-3000
-
Linear Part “Grjazovec-Leningrad”: 5 CPs of LP, 5 CPs of GDS
-
Linear Part of Nord-Stream pipeline: 10 CPs of LP (description)
-
Linear Part of Volhov-Petrozavodsk: 1 CP of LP
19. Pikalevskoye LPA
-
Dispatcher Station of LPA, integrated with ACS CW of CCC, LTS STN-3000
-
Linear Part: 7 CPs of LC, 5 CPs of GDS
20. «Yamal-Europe» main gas pipeline
-
4 CPs of LTS STN-3000 in Smolensk, Torzhok, Rzhev, Holm-Zhirkovskoye LPUs, integrated with Dispatcher Station of LPA of Thaless
-
Linear Part: 26 CPs of LP
21. Severnoe LPA
-
CP of LTS STN-3000
-
Linear Part: 15 ACS of GDS
-
Linear Part of Nord-Stream pipeline: 13 CPs of LC (description)
«Gazprom transgas Moscow»
22. CRP-10
-
Linear Part: ACS of CRPs (GDS), integrated with SuperFlow
23. CRP-14
-
Linear Part: ACS of CRPs (GDS), integrated with SuperFlow
24. CPR-15
-
Linear Part: ACS of CRPs, GDS
«Gazprom transgas Kuban»
25. Rostovskoye LPA
-
CP LTS CS Kamensk-Shakhtinsky, CP LTS of Oksajskaya industrial site, LTS STN-3000
-
Linear Part: 18 CPs of LP, 3 CPs of GRA
«Gazprom transgas Surgut»
26. «Zapolarnoye-Urengoy» main gas pipeline
-
CPs of LTS STN-3000, integrated with ACS PCS7 (Siemens)
-
Linear Part: 21 CPs of LP
-
Looping “Zapolyarnoe-CS Purtazovskaya”: 1 CP of LP
«Gazprom transgas Tomsk»
27. MES and SCADA system of Enterprise: CDP (description)
28. Tomskoye LPA, Tomskaya industrial site:
-
Dispatcher Station of LPA, integrated with LTS STN-3000
-
Linear Part: 5 CPs of LP, 2 CPs of GDS, 8 ACSs of GDS
29. Tomskoye LPA, Parabelskaya industrial site:
-
Linear Part: 6 CPs of LP, 10 CP
30. Tomskoye LPA, Volodinskaya industrial site:
-
Linear Part: 5 CPs of LP, 8 CP
31. Tomskoye LPA, Parabelskaya Chajemtovskaya industrial site:
32. Urginskoe LPA:
-
Dispatcher Station of LPA, integrated with LTS STN-3000
-
Linear Part: 9 CPs of LP, 2 ACSs of GDS
33. Novosibirskoe LPA:
-
Dispatcher Station of LPA, integrated with LTS STN-3000
-
Linear Part: 38 CPs of LP, 18 CPs of CPS, 13 ACSs of GDS
34. Omskoe LPA:
-
Dispatcher Station of LPA, integrated with ACS of GRA
-
Linear Part: 27 CPs of LP, 1 CP of GDS,10 ACS of GDS
35. Barabinskoe LPA:
-
Dispatcher Station of LPA, integrated with LTS STN-3000
36. Novokuznetskoe LPA:
-
Dispatcher Station of LPA, LTS STN-3000
-
ACS of GDS «Novokuznetsk»
37. Kamchatskoe LPA:
-
CP of LTS STN-3000
-
Linear Part: 26 CPs of LP, 2 ACS of GDS (Petropavlovsk-Kamchatskiy)
39. Sakhalinskoe LPA:
«Gazprom transgas Volgograd»
-
«Parameters archive of gas transportation system» program complex
41. Antipovskoye LPA
-
Dispatcher Station of LPA, integrated with LTS «Magistral-2»
42. Bubnovskoye LPA
-
Dispatcher Station of LPA, integrated with ACS of CW «RIUS», LTS MMG
-
Linear Part: pipe bend “Elan-Koleno”, 4CPs of LP, ACS of GDS
43. Pallasovskoye LPA
-
Dispatcher Station of LPA, integrated with LTS «Magistral-2»
44. Pisarevskoye LPA
-
Dispatcher Station of LPA, integrated with ACS of CW «RIUS», TS MMG, CP of GMS Nuovo Pignone
45. Kalacheevskoye LPA
-
Dispatcher Station of LPA, integrated with TS MMG, ACS of CW MSMC, CP of GMS Nuovo Pignone
46. Volgogradskoye LPA
-
Dispatcher Station of LPA, redundant, integrated with ACS of CW MSMC, LTS «Magistral-2», ACSE ABB
47. Kalininskoye LPA
-
Dispatcher Station of LPA, integrated with LTS STN-3000
-
Linear Part: CP of piston launching chamber, 6 CPs of LP
48. Sokhranovskoye LPA
-
Dispatcher Station of LPA, integrated with LTS STN-3000
-
Linear Part: 22 CPs of LP
49. Frolovskoye LPA
-
Dispatcher Station of LPA, integrated with LTS «Magistral-2», CP of CP GDS SupeRTU
50. Gorodischenskoye LPA
-
Dispatcher Station of LPA, integrated with LTS «Compass»
51. Ust’-Buzulukskoye LPA
-
Dispatcher Station of LPA, integrated with LTS «ÌMG»
52. «Olkhovskaya» KS
-
Communication System of LPA, integrated with ACS of NS MSMC-5000
53. «Zhirnovskoe» KS
-
Communication System of LPA
54. «Kotel’nikovskaya» KS
-
Communication System of LPA, integrated with ACS of MS MSMC-5000
«Gazprom transgas Ekaterinburg»
55. MES and SCADA system of Enterprise: start complex of CDP, OS Solaris
56. Magnitogorskoe LPA
-
CP of LTS STN-3000
-
Linear Part: 6 CPs of LP, 6 ACS of GDS
57. Shadrinskoe LPA
-
Dispatcher Station of LPA, integrated with ACS of CW CCC, LTS NIIIS
58. Krasnogorskoe LPA
-
Dispatcher Station of LPA, integrated with ACS of CW «Elna»
59. Maloistokskoe LPA
-
Dispatcher Station of LPA, integrated with LTS «Magistral-2»
«Gazprom transgas Yugorsk»
60. Novourengoyskoe LPA
-
CP of LTS STN-3000, data transfer to DS of LPA
-
Linear Part: 7 CPs of LP
61. Purovskoe LPA
-
CP of LTS STN-3000, data transfer to DS of LPA
-
Linear Part: 3 CPs of LP
«Gazprom transgas N. Novgorod»
62. Volzhskoe LPA
-
CP of LTS STN-3000, data transfer to DS of LPA GOFO-2
-
Linear Part: 6 CPs of LP, 6 CPs of GDS
63. MGP « Pochinki-Grjazovets » : Arzamasskoye LPA
-
3 CP of LTS STN-3000, data transfer to DS of LPA
-
Linear Part: 7 CPs of LP, 1 CP of GRA
-
Communication system SCADA CS Novoarzamasskaya
-
Communication system SCADA CS Lukoyanskaya
64. Vladimirskoe LPA: GCS « Vjazniki » :
-
CP of LTS STN-3000, data transfer to DS of LPA
-
Linear Part: 4 CPs of LP
65. Pochinkovskoe LPA
66. Priokskoe LPA
-
CP of LTS STN-3000
-
Linear Part: 1 CP of LP
«Gazprom transgas Kazan»
67. MES and SCADA system of Enterprise: Central Dispatcher station, OS Windows
68. Al’met’evskoye LPA
-
Dispatcher Station of LPA, CP of industrial site Urus-Su, integrated with LTS STN-3000
-
Linear Part: 6 CPs of LP of MGP «Chelyabinsk-Petrovsk», 17 CPs of LP and 12 ACSs of GDS of MGP «Orenburg-Zainsk»
69. Shemordanskoye LPA
-
Dispatcher Station of LPA, integrated with LTS STN-3000
-
Linear Part: 7 CP of LP
70. Konstantinovskoye LPA
-
Dispatcher Station of LPA, integrated with ACS of GDS «Kazan»
«Gazprom transgas Ukhta»
71. GRSs «Sokol», «Uglich», «Kotlas», «Gryazovets», «Marfino», «Sheksna», «Chagoda», «Vuktyl»:
-
Measuring assemblies: 13 MAs
Gas production enterprises (“GAZPROM” Public Corporation)
|
«Gazprom dobycha Urengoy»
Dispatcher decision support system ("Gazprom" Award in the field of science and technology and the Baibakova award)
-
-
Interfield Manifold: 13 CPs of TS IM
73. «Tab-Yahinskoe» GCF pgCP-10
-
Telemechanics CP STN-3000
-
Well groups: 26 CPs
-
CP for methanol pipeline of PGCP-10 – PGCP-11, 6 CPs of LTs STN-3000, Leakages detection system
74. «En-Yahinskoe» GCF pgCP -11
-
Telemechanics CP STN-3000, data transfer to ACSTP of the field
-
Well groups: 19 CPs
-
Gas pipeline of connection: 3 CPs of LP
75. «Pescovoe» GCF:
-
Telemechanics CP, integrated with GCF
-
Well groups: 39 CPs + 19 CPs (Zapadno-Pescovoe)
-
Water pipeline: 5 CPs of LP
76. «West dome» of North - Urengoy NGCF (without fixed electricity supply):
-
Telemechanics CP
-
Gas wells: 15 CPs
-
Well groups: 5 CPs
77. «East dome» of North - Urengoy NGCF
-
CP of Telemechanics System of gas wells groups
-
Gas wells groups: 12 CP
78. Second experimental area of Achimovskie gas pools
-
CP of TS
-
Weels groups: 6 CPs, methanol pipeline:2 CPs, condensate pipeline: 10 CPs, gas pipeline of connection: 1 CP
«Gazprom dobycha Yamburg»
-
Telemechanics CP, integrated with GCF
-
Gas wells: 132 CPs
-
Well groups: 23 CPs
-
Gas pipeline of connection: CP of LP
80. «Zapolarnoe» gas field: PGCP -2c
-
Telemechanics CP, integrated with GCF
-
Well groups: 24 CPs
-
Gas pipeline of connection: 3CPs of LP
81. «Zapolarnoe» gas field: PGCP -3c
-
Telemechanics CP, integrated with GCF
-
Well groups: 26 CPs
“Gazprom dobycha Orenburg”
82. Dedurovskiy koridor:
-
Linear Part: 3 CPs of LTs
Independent enterprises for gas production and gas transportation
|
«Sibneftegas»
83. SCADA system for «Beregovoye» gas field: (1st stage)
-
Telemechanics CP, integrated with GCF
-
Gas wells: 30 CPs
-
Well groups: 10 CPs
-
Gas pipeline of connection: 2 CPs of LP
«SevernefteGazprom»
84. SCADA system for «Yuzhno-Russkoye» gas field
-
Telemechanics CP
-
Well groups: 41 CPs
-
Gas pipeline of connection: 5 CPs of LP
NK «Severneft’»
85. “Zapadniy Yarohinskiy licensed plot”
-
Pipeline of connection: 3 CPs of LP
«VostokGazprom»
86. GMS to «Methanol» Private Corp.
-
ACS of GMS, integrated with SuperFlow
«Kirishimejraygas»
87. «Kirishi» gas distribution station:
-
Measuring assemblies: 9 MAs
«Gazpromneft’-ONPZ»
88. Omskiy NPZ:
Underground gas storage (UGS)
|
«Gazprom transgas Chaikovskiy»
89. «Karashurskoe» UGS (“ATGS – Siemens” Consortium)
-
ICS of SGUS: 2 CPs, fire extinguishing systems, video surveillance systems, ecological monitoring
-
ACSTP SGUS: 33 cabinets of PCS7 automatics (Siemens), 2 CPs of LP
-
Gas wells: 25 CPs
-
Communication system SPURT
90. Leningradskoe UGS
-
ASUTP of SGUS: DS
-
ACS of gathering stations: 2 ACSs
91. System of dispatcher control OOO “Gazprom UGS”
Oil and oil products pipelines
|
«Peterburgtransnefteproduct»
-
DS of HPS, DS of LPDS
-
Pump station: 3 ACSs of pump station
-
Linear part: 18 CPs of LP, 5 measuring assemblies based on Micro-Motion (Fisher-Rosemount)
«Mejregiongas Ltd»
-
Program complex «Dispatcher control system» («Gas delivery»)
Heat Supply Networks of Chita, Ulan-Ude, Dolgoprudniy, Kashira, Mytyschy cities
-
«Computation and analysis of hydraulic and heat modes for heat supply water networks» program complex
|